Session Enclosures Designers and consultants Builders and trades

Panelized Prefab: Building Confidence in Passive House Construction

How panelized prefabrication can reduce risk, improve quality, and make Passive House projects more predictable, from early coordination to workflow, with single-family and multifamily case studies from Washington State.

Key points

  • Key principles of panelized prefabrication and Passive House workflows.
  • Prefab and site-built compared for quality, cost, schedule, and risk.
  • How early coordination and digital fabrication improve outcomes.
  • Integrating architecture, engineering, and fabrication teams.
  • Common challenges in cost, flexibility, and constructability, and their solutions.

Topics: Insulation and assemblies, Quality assurance

More in this area